Electric Power Supply
Present Electric Load | 48.360 (in KW) | Hyperlink to Document Proof |
Date of Connection | 17.07.2012 | |
Connection in the Name | Principal, Govt. ITI Nurpur | |
Meter No. | HPDO3066 | 1 |
Seal No. | ||
Remarks |
Present Electric Load | 48.360 (in KW) | Hyperlink to Document Proof |
Date of Connection | 17.07.2012 | |
Connection in the Name | Principal, Govt. ITI Nurpur | |
Meter No. | HPDO3066 | 1 |
Seal No. | ||
Remarks |